I. ASSET CONDITION & OPERATIONAL AUDIT
​
-
Physical Lifecycle Assessment: Forensic evaluation of all major components (compressors, coils, heat exchangers) to determine Estimated Useful Life (EUL) versus current degradation.
-
Operational "True-North": Verification of system performance against original design intent. This includes measuring Delta-T across coils and Static Pressure within the ductwork to identify distribution bottlenecks.
-
Mechanical Integrity: Inspection of cabinet seals, curb integrity, and vibration isolation to prevent bypass air and structural noise.
​
II. ENERGY UTILIZATION & EFFICIENCY ANALYSIS
-
Load-to-Asset Alignment: Analysis of current occupancy heat loads versus equipment capacity. We identify "oversized" liabilities that lead to short-cycling and spiked utility bills.
-
VFD & Motor Efficiency: Evaluation of all fan and pump motors. We identify opportunities for Variable Frequency Drive (VFD) retrofits to reduce "part-load" energy consumption.
-
Refrigerant Phase-Out Strategy: Assessment of current refrigerant types (R-22, R-410A) and a roadmap for transitioning to high-efficiency, low-GWP alternatives (<750) to avoid future carbon taxes and supply chain spikes.
​
III. BMS & CONTROLS FORENSICS (THE BUILDING BRAIN)
-
Sequence of Operations (SOO) Audit: We verify if the Building Management System is actually executing the design intent. We identify "manual overrides" and "locked setpoints" that bypass energy-saving logic.
-
Sensor Calibration: Verification of all discharge air, mixed air, and space temperature sensors. A sensor that is off by 2°F can increase mechanical run-time by 10-15%.
-
Economizer Functionality: Testing of outside air dampers and enthalpy logic to ensure the building is utilizing "free cooling" whenever ambient conditions allow.
​
IV. ABOVE-CEILING & TENANT IMPACT EVALUATION
-
Distribution DNA: Inspection of VAV boxes, dampers, and flex-duct runs above the ceiling grid. We identify design defects where air is "trapping" or failing to reach the tenant's occupied zone.
-
Zoning Logic: Evaluation of thermostat placement versus current tenant floor plans. We identify "thermal fighting" where adjacent zones are simultaneously heating and cooling due to outdated partitioning.
-
Indoor Air Quality (IAQ): Assessment of filtration levels and outdoor air intake volumes to ensure compliance with modern ventilation standards and tenant comfort.
​
V. STRATEGIC RECOMMENDATIONS & FINANCIAL ROADMAP
-
Prioritized Capital Plan: A tiered list of recommendations (Immediate, 1-3 Years, 5+ Years) based on risk of failure and ROI.
-
Repair vs. Replace Modeling: A fiduciary analysis of continuing to fund repairs on aging assets versus the 10-year OpEx recovery of a high-efficiency replacement.
-
The "Technical Tax" Recovery: Identification of specific areas where current vendor maintenance is failing to meet the "Owner’s Standard," providing the leverage needed to hold contractors accountable.